百級凈化室工程一直是凈化界的重要研究方向,因為涉及范圍廣,包含建設(shè)水電、空調(diào)、環(huán)保、防震等一系列工程,需要全方位的人才策劃方案,為了減少出錯率就需要在施工前好好策劃工程的相關(guān)注意事項。
凈化室方案策劃關(guān)鍵:
1.作業(yè)者、資料、化學(xué)藥品等動線勿會集。
2.制作裝置之收支,需不對作業(yè)發(fā)生大影響。
3.超潔凈室四周,宜設(shè)緩沖區(qū)(即較差潔凈區(qū))。
注意事項:
1.潔凈度等級。
2.室壓之平衡辦法。
3.溫濕度要求。
4.機器設(shè)備之必要性。
5.斷定生產(chǎn)流程。
6.部分排氣之必要性。
7.日后擴大彈性。
8.滿足保護保養(yǎng)空間。
9.空調(diào)送風(fēng)方法。
10.職工歇息區(qū)之安排。
11.設(shè)施與動力之裝備。
12.室內(nèi)凈高與樓板載重。
13.設(shè)備空間與管道間。
14.門窗宜少,氣密性要佳。
15.靜電、振蕩及噪音。
16.生產(chǎn)線與活動線少穿插。
17.公害、污染與防災(zāi)。
18.裝置及工作成本之衡量。
對于物料、人員的通道路線行業(yè)術(shù)語為動線,在設(shè)計時要加入考慮方案中,施工時,要重復(fù)分析工作人員的通道、物料的通道、配置設(shè)備、排氣管道、物料運輸?shù)茸鳂I(yè)流程,盡量縮短動線,并避免穿插,以避免穿插污染。
Key construction items in the project of 100 grade purification room
100 grade purification room project has always been an important research direction of the purification industry, because it involves a wide range of projects, including building a series of projects such as hydropower, air conditioning, environmental protection, earthquake prevention and so on. It needs a comprehensive plan of talent planning. In order to reduce the error rate, it is necessary to carefully plan the related matters before the construction.
Purification room scheme planning key:
1. operators, materials, chemicals and other moving lines should not be collected.
2. the revenue and expenditure of the device should not be greatly affected.
3. a buffer zone should be set up around the clean room.
Matters needing attention:
1. cleanliness grade.
The balance method of 2. chamber pressure.
3. temperature and humidity requirements.
4. the necessity of machine equipment.
5. determine the production process.
The 6. part of the exhaust is necessary.
7. days after the expansion of elasticity.
8. to meet the protection and maintenance space.
9. air conditioning air supply method.
10. arrangements for the rest area of the staff and workers.
11. facilities and power equipment.
12. indoor net height and floor load.
13. the space between the equipment and the pipe.
14. doors and windows should be less, air tightness is better.
15. static, oscillating and noise.
16. the production line is less interspersed with the active line.
17. public hazards, pollution and disaster prevention.
18. the measurement of the equipment and the cost of work.
For materials and personnel, the line line industry terminology is moving line, in the design to join the consideration of the project, during the construction, we should repeat the analysis of staff channel, material channel, configuration equipment, exhaust pipe, material transportation and other operational processes, as far as possible to shorten the line, and avoid penetration, in order to avoid interspersing pollution.